Tuesday, August 20, 2013

Launch of the GSLV-D5 Called off


The Launch of the GSLV-D5 scheduled for 1650 hrs today (August 19, 2013) is called off, as a leak is observed in the UH 25 fuel system of the liquid second stage during the pre-launch pressurization phase on the vehicle just two hours before the scheduled lift-off.

The propellants are being drained from the Cryogenic Stage, Liquid Second Stage and the four liquid Strap-ons of GSLV-D5. The vehicle will be moved back to the Vehicle Assembly Building for further actions.

The revised launch date will be announced after a detailed assessment

No comments:

Post a Comment